# AI Data Centers: Power, Water and Who Pays

A source-linked inventory of **442 major AI and hyperscale data center
campuses** in 71 countries. Companion studies cover US electricity prices,
water and operator efficiency. Every row names its source.

**Live dashboard: <https://tedngai.github.io/datacenter-efficiency-study/>**

**For environmental and community groups, start with
[`docs/community_brief.md`](docs/community_brief.md).**

## The thesis

**Most AI data center capacity is not built yet. So the main community question
is about decisions that are still open, not about damage that is already done.**

- **Most of the load is a plan.** We track 123 GW of stated capacity. Planned
  and under-construction sites hold 70% of it, and operational sites hold 17%.
  In the US the figures are 68 GW, 66% and 15%.
- **Electricity costs reach households through the regional market.** PJM's
  market monitor estimates that data center load added $9.33 billion to the
  $14.69 billion 2025/26 capacity auction. Rate design decides who pays that
  cost: minimum-take tariffs, direct assignment of transmission, and
  bring-your-own generation.
- **Water is local, and the design sets it.** At the same IT load, the reported and
  design water intensities differ by a factor of 500 between evaporative and
  closed-loop designs. One evaporative campus (Google Council Bluffs) consumed
  more water in 2025 than Meta's whole global fleet in 2024.
- **Disclosure is the bottleneck.** Only 4 of 13 operators publish assured
  annual energy and water figures. Only Google publishes water by site.
  Secrecy, more than volume, starts most of the water disputes in our data.

The data does not support "every data center raises your bill". It also does
not support "data centers lower your bill". The brief gives the evidence, the
caveats and the gaps, for example air emissions from on-site gas, which we do
not track.

**About the compute figures.** The inventory also estimates compute in
H100-equivalents (H100e), so that sites with different chips can be compared.
H100e measures scale, not resource use. For power, water and cost, use the MW,
water and price columns.

## Files

| File | Description |
|---|---|
| `docs/community_brief.md` | **Start here.** The thesis and the evidence on power, water and bills, for community readers |
| `data/published/data_centers.csv` | Final dataset, one row per campus, sorted by best H100e estimate |
| `data/published/data_centers.json` | Same data as JSON (typed numbers) |
| `index.html` | Self-contained dashboard: capacity map, who-pays view (state prices, PJM estimate, utility finder), water and efficiency views, scenario lab. Open directly in a browser. |
| `data/canonical/data_centers.csv` | Canonical source of truth (edit this, then rebuild) |
| `data/raw/data_centers_raw.csv` | Original research capture (kept for provenance) |
| `pipeline/build.py` | Computes H100e columns and regenerates outputs: `python pipeline/build.py` |
| `pipeline/frontend/` | Maintainable HTML template, CSS, and JavaScript embedded into `index.html` by the build |
| `pipeline/country_table.py` | Regenerates the country-level summary table |
| `data/us_utility_impacts.csv` | 55 US utility territories: prices, rate cases, water, complaint groups |
| `docs/us_water_energy.md` | US local energy/water impacts report |
| `docs/us_impacts_verification.md` | Verification log for the US impacts study |
| `data/operator_efficiency.csv` | PUE / WUE / water-per-MW-year for 13 operators |
| `docs/operator_efficiency.md` | Operator efficiency analysis and comparability caveats |
| `data/gpu_platforms.csv` | 41 accelerator platforms: TDP, rack cooling, heat-to-liquid share, sources |
| `data/gpu_cooling.csv` | Per-site accelerator match, heat estimate, rack cooling, heat rejection, water |
| `data/gpu_cooling.json` | Same, typed JSON |
| `pipeline/build_gpu_cooling.py` | Generates the per-site cooling dataset from the platform table |
| `docs/gpu_cooling.md` | Accelerator/cooling analysis: why GPU vendor does not determine water |
| `DATA_DICTIONARY.md` | Column definitions for all five published CSVs |
| `AGENTS.md` | Operating brief for AI agents: role, conventions, git and credential policy |
| `PROGRESS.xml` | Append-only log of decisions, incidents, verifications and changes |

Companion studies:
- `data/us_utility_impacts.csv` + `docs/us_water_energy.md`: US local
  energy/water impacts, with `docs/us_impacts_verification.md`.
- `data/operator_efficiency.csv` + `docs/operator_efficiency.md`: PUE/WUE
  comparison across Google, Meta, Microsoft, AWS, xAI and the neoclouds.
- `data/gpu_cooling.csv` + `docs/gpu_cooling.md`: per-site accelerator and
  cooling evidence, with rack cooling separated from facility heat rejection.

## Interactive dashboard

`index.html` follows the thesis, in this order:

- **Overview:** stated power by build status (world and US), and four finding
  cards: power, bills, water and disclosure.
- **Capacity map:** search and filter 442 campuses. Marker size and the
  leaderboard use stated power by default. Compute (H100e) is an option. Each
  site shows its status, its note and its source, and you can export the
  filtered rows.
- **Who pays:** the residential price rise for each state with a tracked site
  (EIA), colored by PJM membership. Each bar shows the tracked operating AI
  capacity in that state. A card gives the PJM market monitor's
  capacity-auction estimate. A finder for
  the 55 utility territories: prices, rate cases, named groups, water and
  sources, with the verification grade.
- **Water:** documented shares of local supply, then the operator PUE/WUE
  chart and the 13 operator disclosures.
- **Site evidence:** cooling energy and water per MW for every campus. A
  coverage strip states how many sites can answer it. Of 442 sites, 306 have a
  power denominator, 127 an operator-disclosed PUE, 92 a water intensity, and
  87 both. Those 87 collapse onto **six distinct positions**, because both
  numbers are operator-level. A rack-cooling × heat-rejection matrix covers all
  442 sites. The page marks the industry-default PUE of 1.20 with `*`.
- **Scenario lab:** annual facility electricity and water for two operator
  profiles at a chosen IT load. These are unit conversions at full
  utilization, not campus forecasts.
- **Method:** power, water and compute, and the list of what the page does not
  track yet.

Edit the sources in `pipeline/frontend/`, then run `python pipeline/build.py` to
regenerate the self-contained page. The build embeds the site, operator,
cooling, utility and state price values at build time. The map tiles, Leaflet, and web fonts need an internet connection.

## H100e methodology

An **H100e** = the compute of one NVIDIA H100 SXM. Operators do not publish H100e,
so every value here is an estimate. The build computes four estimates.
`h100e_best` uses the most direct available signal:

1. **`h100e_gpu` — from announced GPU counts** (most direct). Conversion factors
   (dense FP8 compute ratio vs H100's 1,979 TFLOPS):
   - H100 / H200 / H800 / unspecified "GPUs" = **1.0**
   - B200 / GB200 = **2.25**. GB300/B300 = **2.5**
   - A100 = **0.315**. Trainium2 = **0.34**. Ascend 910B ≈ **0.35**. L40S = **0.19**
   - AMD MI355X = **2.5** (5.0 PF dense OCP-FP8 per AMD ÷ 1.979 = 2.54, rounded
     like B300)
   - **Mixed generations.** If the site publishes a count per model, we add up
     count × factor for each model. If it does not, and the models have different
     factors, `h100e_gpu` stays blank and `h100e_best` uses the next method. If
     only part of the fleet has a published count, we convert that part and the
     note calls the value a floor.
2. **`h100e_third_party`** — estimates from Epoch AI's data center directory,
   recorded during research. We use these for several Stargate sites, China sites,
   DayOne and others. A third-party H100e always goes in this column, also when
   the third party derived it from GPU counts.
3. **`h100e_flops`** — announced cluster peak PFLOPS (dense FP8-equivalent) ÷ 1.979.
4. **`h100e_power`** — power-based estimate. Assume 60% of IT load powers H100-class
   accelerator systems at ~1.2 kW per GPU, which gives **500 H100e per MW of IT
   load**. If we know only gross facility power, IT load = MW ÷ 1.2 (PUE 1.2),
   which gives **≈417 H100e per MW**.

`h100e_method` says which estimate `h100e_best` came from: `gpu_count` >
`third_party` > `flops` > `power`.

## Columns

`name, operator, city, state_province, country, latitude, longitude, power_capacity_mw,
it_load_mw, announced_gpu_count, gpu_types, cluster_peak_pflops, h100e_gpu,
h100e_third_party, h100e_flops, h100e_power, h100e_best, h100e_method, status,
status_note, source_url, location_shared_with`

- `power_capacity_mw` = gross facility/utility power. `it_load_mw` = IT load where
  reported.
- `location_shared_with` = the number of other sites at the same point (to ~1 km).
  41 sites share a point with at least one other site, for example seven in
  Riyadh. Those coordinates are probably a city centre, not the campus. The map
  spreads such sites on a small ring and marks them as approximate.
- Blank = not published or not found. **We invented no values**. Where a figure is
  a rumor or analyst estimate, `status_note` says so.
- `cluster_peak_pflops` appears only where officially announced. Most are blank,
  because few operators publish it. The Deutsche Telekom 0.5 EFLOPS claim is
  inconsistent with its GPU count, and we keep it as announced (see note).

## Status classification

Each site has a `status` column (also color-coded on the map):

| Status | Meaning | Count |
|---|---|---|
| `operational` | Fully operating. The campus may still have announced expansions | 199 |
| `partially_operational` | First phase(s) live, but the campus is still ramping to its target capacity | 35 |
| `under_construction` | Construction underway. No live AI capacity yet, or first energization imminent | 117 |
| `planned` | Announced or leased, construction not yet started (incl. some with uncertain status) | 91 |

So **only 199 of 442 sites (45%) are fully operational**. Gigawatt-scale projects
still under construction dominate the field. Judged by H100e, the split is
starker. About **81%** of the total tracked H100e sits in sites that are not yet
fully operational. 70% sits in sites that are only planned or under
construction. Fully operational sites hold 11.6M H100e (19%). The biggest single
estimates — Fermi America, Wonder Valley, Stargate Saline, Port Washington,
Hyperion, Stargate UAE — are all planned or under construction.

(Before the Nov 2026 review this paragraph said "roughly two-thirds". That was
wrong: the share was 81% then too.)

Chinese sites mostly use Ascend or heterogeneous chips. Their announced "X万P"
figures are FP16/mixed-precision and recorded in notes. We do not convert them
into `cluster_peak_pflops`.

## Caveats

- **Scope**: major AI/hyperscale campuses only (roughly 100 MW+ or named 10k+ GPU
  clusters). We exclude ordinary colo/enterprise data centers and national-lab
  supercomputers (Frontier, El Capitan…). The exceptions are systems that are
  notable AI systems, for example JUPITER/JAIF and the EuroHPC AI factories.
- **Estimates span very different confidence levels**. An Epoch AI projection for
  a 2028 build-out and a measured IT load are not equally reliable. Read
  `status_note` before you quote any number.
- Power-based H100e is an upper-bound-style estimate. It credits the whole campus
  to H100-class accelerators, which overstates sites that host general cloud
  workloads. **It supplies 41.6M of the 61.4M total (68%).** Most of that is
  nameplate capacity at sites that are not built yet.
- We compiled the data via web research from operator press releases, regulator
  filings, Epoch AI, DataCenterDynamics, and press coverage (sources in
  `source_url`). The data is current as of **November 2026**. The field moves
  fast, and many "under construction" figures are targets.
- GPU conversion factors are dense-FP8 compute ratios. They ignore memory
  bandwidth, FP4, and interconnect differences that matter a lot in practice.

## Headline numbers (as of compilation)

- **442 campuses**, 349 with a quantifiable H100e estimate
- **~61.4M H100e** total across tracked sites. This is not a count of installed
  compute:
  - 68% (41.6M) is power-based, 26% (15.7M) third-party, 7% (4.1M) from GPU counts.
  - 70% (43.1M) is at sites that are only planned or under construction.
    Fully operational sites hold 11.6M (19%).
  - The two largest figures, Fermi America's ~4.6M and Wonder Valley's ~3.1M
    H100e power-based estimates, are speculative proposals without named tenants.
- Largest tracked sites: Stargate Saline Township MI (~2.9M), Stargate Port
  Washington WI (~2.6M) and Meta Hyperion LA (~2.1M power-est). Also Stargate
  UAE (~2.0M), xAI Colossus 2 (~1.1M) and Stargate Abilene TX (~1.0M).
- Nov 2026 review: the total was ~64.0M. A correction pass
  (`pipeline/verification/verify_apply5.py`) applied the mixed-generation rule
  and moved Epoch estimates to the third-party column. It also removed an
  unverified 1,289 MW figure for Meta Prineville. Meta Prometheus changed from
  2.25M (1M-GPU target × GB200 factor) to 347,500 (695 MW IT). See
  `PROGRESS.xml` C-entry for every row.

## US local impacts (water & energy prices)

Companion research on the 121 US sites: **`data/us_utility_impacts.csv`** (55
rows, one per utility territory). Each row holds the serving utility and type, a
5-year energy price trend, rate events and named community groups that complain
about bills. It also holds documented water consumption, water complaints,
sources and a verification grade. See also **`docs/us_water_energy.md`** (summary,
headline findings, and the water big-drinker table). We re-based all price series
on EIA annual data (Table 2.10) and the Jan–Aug 2026 monthly table. We checked
the load-bearing water and rate claims against primary sources. See
**`docs/us_impacts_verification.md`** for the correction table and residual
caveats.

Key takeaways: PJM capacity costs drove the sharpest 2021→2026 bill increases
(PA +53.6%, NJ +47.3%, OH +47.3%, IL +45.9%, VA +41.7%, US average +33.2%). The
2025-26 period brought a wave of data-center rate classes (Dominion GS-5, AEP
Ohio DCT, Duke, PGE Oregon +29.7% on DCs). Water-disclosure secrecy is the most
common trigger for complaints (The Dalles, Chesterfield "Peanut", Eagle Mountain
confidentiality clause, Racine lawsuit). This research found and fixed three
dataset errors. Cipher Barber Lake is in Colorado City TX, Nscale is in the town
of Madison, Rockingham County NC, and Boydton is co-op territory, not AEP.

## Operator efficiency (PUE / WUE)

Companion comparison of Google, Meta, Microsoft, AWS, xAI and the neoclouds:
**`data/operator_efficiency.csv`** (PUE, WUE, water per MW-year, low-carbon share,
disclosure grade, sources) and **`docs/operator_efficiency.md`** (analysis).
Headline: Meta is best on both axes among the big four (PUE 1.08, WUE 0.19
L/kWh). AWS uses least water (0.12). Google has the best PUE of the largest fleet
(1.09) but is 5–8× more water-intensive per kWh (1.02, derived). Microsoft sits
between (1.17 / 0.27). Energy and water trade off: evaporative cooling cuts PUE
and raises water. Nebius and Crusoe post the best water numbers on cold-climate
liquid-cooled designs. CoreWeave, Applied Digital, Lambda, Galaxy and xAI publish
no usable PUE/WUE.

## Accelerators, cooling and water

Companion study of what hardware each site runs and what that implies for
cooling. **`data/gpu_platforms.csv`** (41 accelerator platforms with TDP, rack
system, rack cooling, heat-to-liquid share and sources), **`data/gpu_cooling.csv`**
/ **`.json`** (one row per site) and **`docs/gpu_cooling.md`** (analysis).
`pipeline/build_gpu_cooling.py` generates them after `pipeline/build.py`.

Headline: **the GPU vendor does not determine water use.** Rack cooling (air,
direct-to-chip liquid, immersion) and facility heat rejection (evaporative
towers, dry coolers, hybrid) are separate decisions. Google's liquid-cooled TPUs
still reject heat through cooling towers. NVIDIA's liquid racks can run on dry
coolers, but only if the operator builds them. Of 442 sites, 177 name a platform,
and 52 have enough evidence for an accelerator-heat estimate (36 single TDP, 16
ranged). 93 carry a water figure, and every one is an operator-fleet WUE scaling,
not a site measurement. Two of those (xAI) rest on a stated 1.0 L/kWh estimate
rather than a disclosure. Hardware confidence is B 39 / C 65 / D 338, with no A.
No site combines an official TDP, a published count and site-specific cooling
evidence.

The dashboard's **site efficiency** view turns that coverage into the headline it
implies. The page plots a campus only if it has both an *operator-disclosed* PUE
and a water intensity. The industry-default 1.20 that fills 315 rows does not
count as evidence. That leaves 88 campuses, and they land on six distinct
positions (Google 26, Meta 20, Microsoft 19, AWS 14, Nebius 5, Crusoe 4). The
PUE is the operator's fleet figure, and the water is the operator's fleet WUE
applied to site IT load. Bubble area is the number of campuses at that position.
The rack-cooling × heat-rejection matrix is the part that stays genuinely
per-site. 36 sites are evaporative with no rack evidence, and 39 are
direct-to-chip with unknown rejection. Only 34 of 442 name both a rack cooling
type and a rejection type.

## Country-level summary

| Country | Sites | MW (known) | H100e (known) |
|---|---:|---:|---:|
| United States | 121 | 68,148 | 35,895,726 |
| China | 29 | 1,926 | 836,420 |
| Malaysia | 25 | 4,481 | 2,624,634 |
| India | 25 | 7,560 | 3,002,471 |
| Mexico | 23 | 1,828 | 838,280 |
| Canada | 20 | 10,404 | 4,341,931 |
| Japan | 16 | 2,094 | 880,405 |
| South Korea | 13 | 913 | 441,789 |
| Saudi Arabia | 12 | 2,616 | 1,152,050 |
| South Africa | 11 | 887 | 374,834 |
| Brazil | 10 | 3,282 | 1,297,416 |
| Australia | 9 | 2,550 | 1,173,667 |
| United Kingdom | 9 | 990 | 519,734 |
| United Arab Emirates | 8 | 1,360 | 2,171,001 |
| Germany | 7 | 260 | 148,435 |
| France | 6 | 2,430 | 1,073,833 |
| Italy | 5 | 707 | 318,208 |
| Sweden | 5 | 820 | 335,067 |
| Poland | 5 | 43 | 33,650 |
| Israel | 4 | 196 | 89,382 |
| Finland | 3 | 985 | 428,167 |
| Denmark | 3 | 810 | 357,500 |
| Spain | 3 | 400 | 160,000 |
| Ireland | 3 | 675 | 301,250 |
| Netherlands | 3 | 350 | 151,800 |
| Norway | 3 | 272 | 146,606 |
| Turkey | 3 | 300 | 125,003 |
| Chile | 3 | 270 | 125,000 |
| Nigeria | 3 | 177 | 88,500 |
| Kazakhstan | 2 | 300 | 126,011 |
| Taiwan | 2 | 400 | 150,000 |
| Indonesia | 2 | 190 | 132,386 |
| Bangladesh | 2 | 200 | 83,333 |
| Singapore | 2 | 206 | 103,000 |
| Vietnam | 2 | 144 | 61,333 |
| Thailand | 2 | 147 | 65,167 |
| Kenya | 2 | 30 | 11,250 |
| Pakistan | 2 | 10 | 4,042 |
| Uruguay | 2 | - | - |
| Argentina | 1 | 500 | 208,333 |
| Trinidad and Tobago | 1 | 450 | 187,500 |
| Oman | 1 | 400 | 166,667 |
| Jordan | 1 | 400 | 166,667 |
| Belgium | 1 | 300 | 130,000 |
| New Zealand | 1 | 280 | 116,667 |
| Costa Rica | 1 | 200 | 83,333 |
| Paraguay | 1 | 106 | 44,167 |
| Armenia | 1 | 100 | 41,667 |
| Portugal | 1 | 1,200 | 31,500 |
| Philippines | 1 | 50 | 25,000 |
| Guatemala | 1 | 50 | 20,833 |
| Egypt | 1 | 20 | 10,000 |
| Morocco | 1 | 16 | 8,000 |
| Iceland | 1 | 5 | 5,821 |
| Slovenia | 1 | - | 5,053 |
| Uzbekistan | 1 | 12 | 5,000 |
| Romania | 1 | - | 2,527 |
| Czechia | 1 | - | 430 |
| Serbia | 1 | - | 58 |
| Greece | 1 | - | - |
| Switzerland | 1 | - | - |
| Qatar | 1 | - | - |
| Bahrain | 1 | - | - |
| El Salvador | 1 | - | - |
| Ethiopia | 1 | - | - |
| Bulgaria | 1 | - | - |
| Lithuania | 1 | - | - |
| Hungary | 1 | - | - |
| Ukraine | 1 | - | - |
| Azerbaijan | 1 | - | - |
| Peru | 1 | - | - |

MW = sum of known gross power, with IT load where gross data is missing. It mixes
announced, operating and speculative capacity, so treat it as a scale indicator,
not a current draw. H100e totals are the sum of per-site best estimates.

## Coverage history

The counts in this section are the totals after each research pass. Later
passes added more sites, so the current counts are in the country table above. The first research pass was thin on Asia and empty on
Latin America. Later deep-dives expanded China (24 sites, the "Eastern Data,
Western Computing" intelligent computing centers). Malaysia grew to 22 sites,
because Johor is one of the fastest-growing AI DC markets. They also expanded
Japan (15), South Korea (12), Europe (+26, incl. EuroHPC AI factories and
gigafactory candidates), the Middle East (+19), and Latin America (+15). Most of
the Latin America entries are an announced pipeline. No operating 50MW+
AI-dedicated campus or 10k+ GPU cluster exists in the region yet. The
largest GPU deployment is Mexico's planned 14,480-GPU Coatlicue supercomputer.

A final North America pass added Canada (+14). It includes Meta's first Canadian
DC, the 1GW Sturgeon campus, Canada's sovereign AI factories from
TELUS/Bell/Calcul Québec, and the speculative 7.5GW Wonder Valley proposal. It
also added deeper Mexico (+17, the Querétaro corridor:
AWS/Google/Oracle/Alibaba regions, ODATA QR01/02/04, Ascenty, Bleeding Edge's
LatAm-first Blackwell B300 neocloud). It added the first Central America/Caribbean
entries (+4, all small or speculative. The region has no AI-scale campus yet).

Three final passes added Africa (+15: Teraco Johannesburg/Cape Town, Nigeria's
Kasi and Rack Centre, Egypt's sovereign AI DC, Morocco's Nexus. No published GPU
counts exist anywhere on the continent). They added Eastern Europe, the Caucasus
and Central Asia (+18). That covers EuroHPC AI factories in
Czechia/Romania/Bulgaria/Lithuania/Slovenia/Hungary, Kazakhstan's Alem H200
supercomputer and 100k-GPU Data Center Valley, and Armenia's Firebird. They also
added India/South Asia (+21). That covers the IndiaAI national GPU pool, Yotta's
Blackwell Ultra buildout, L&T Vyoma's 10k-B300 factory for Together AI,
Google/Adani Vizag and other gigawatt campuses. Pakistan and Bangladesh get their
first entries.

A US re-sweep (+63) then filled the biggest remaining hole. It added Google's
TPU-campus fleet (Columbus/New Albany/Lancaster OH, Bristow VA,
Omaha/Lincoln/Papillion NE, Mesa AZ, Midlothian TX, Kansas City, Storey County
NV). Several of those sites carry 100k-330k H100e Epoch estimates. It also added
Meta's remaining sites (Rosemount, Kuna, Cheyenne, Eagle Mountain, Los Lunas,
Montgomery, Temple, Bowling Green, El Paso 1GW). It added Microsoft (Pecos 2GW,
Goodyear, Project Osmium) and AWS (Berwick PA Rainier leg, Richmond County NC,
Georgia, Arizona).
It added QTS Richmond (~562MW). It also added the crypto-to-AI conversion wave
(Hut 8 Beacon Point 1GW for Nvidia, Riot, Cipher/AWS, Bitdeer, MARA, Core
Scientific, Bitfarms, Applied Digital PF3). It also added neoclouds (Nscale Ward
County, Vultr's 24k-MI355X Springfield supercluster, CloudBurst, and Fermi
America's proposed 11GW Amarillo HyperGrid). That last site is now the single
largest power figure in the dataset, and it is still speculative.

A final country-by-country sweep (+63) closed the remaining regional gaps.
Australia went from 1 to 9 sites. The additions are AirTrunk
SYD2/SYD3/MEL1/MEL2, CDC Marsden Park at 720MW (the Southern Hemisphere's
largest), NEXTDC M3, Firmus's 18,400-GPU GB300 cluster and AWS Sydney. Singapore
went from 0 to 2 (Nxera Tuas, AirTrunk), and Indonesia 0 to 2 (Oracle and PDG in
Batam). Thailand went 0 to 2, the Philippines 0 to 1 (VITRO), and New Zealand 0
to 1 (Datagrid's 1GW Invercargill project). Denmark went from 0 to 3 (Meta Odense
~475MW, Google Fredericia, CA Skive), and Belgium 0 to 1 (Google Saint-Ghislain).
Ireland went from 1 to 3 (Meta Clonee, AWS Cruiserath), and the Netherlands 1 to
3 (Google Eemshaven, Microsoft Middenmeer). Spain gained Microsoft Aragon, France
SoftBank Bouchain/Eclairion, Italy Trino/Milan, and Sweden atNorth Sollefteå. It
also added Canada's Saskatchewan/New Brunswick wave, Brazil's RT-One/Ada/Tecto
buildout, Chile's Cerrillos and Ascenty SCL04/05, and Peru's first entry. Also
the Saudi Microsoft region, Oman/Jordan 400MW proposals, Israel's Ofek, Kenya's
iXAfrica, and India's STT Palava/PDG MU1/AdaniConneX Noida/CtrlS Future City
additions.

## Regenerating

```bash
python pipeline/build.py              # canonical CSV -> published CSV/JSON + index.html
python pipeline/build_gpu_cooling.py  # published CSV + gpu_platforms.csv -> gpu_cooling.csv/json
```